Wednesday
Apr272011

Wednesday
Apr272011

Wednesday
Apr272011

Monday
Apr112011

ANALYSIS OF BOARDWALK

Wednesday
Mar092011

Wednesday
Mar092011

Tuesday
Mar082011

Some Stream Stuff

Tuesday
Mar082011

Updated Foundation Info

Friday
Feb252011

shaping the boardwalk: diagrams

 

Friday
Feb252011

concept perspectives

 

Monday
Feb142011

Sample Calculation

Monday
Feb142011

Beam Design Summary

Sunday
Feb132011


Sunday
Feb132011


Sunday
Feb132011


Sunday
Feb132011

Boardwalk and Stream Info

 

Here is our slide that we will be presenting for the Feb 14 presentation. The site plan is a general conceptual idea of where we would locate the boardwalk and where we would put time into restoring the stream. We have some conceptual designs for features that could be implemented into the boardwalk and the stream that will be presented Monday and uploaded at a later date. The slide also includes a sketch of the foudation being proposed for this project. The image shows how the soils between the two driven piles causes an arching effect that makes the soil to act as a shallow footing. Along with the image a simple bearing capacity calculation was performed with soils that could be representative of the soils within the environmental park.